Day of arrival 11/30/2005
1/4/2006
Disassembly has begun. An NOS LT1 hood and original front have been located and
are now in our shop.
1/11/2006
The body is prepped for removal.








1/12/2006
The body is now removed providing full access to the frame.
1/13/2006
The frame will be taken apart.
1/23/2005
The chassis components are now being rebuilt.
1/25/2006
The Chassis is clean, ready for reconstruction.
1/30/2006
2/2/2006
The Front end is now being prepped.
2/3/2006
The headlight assemblies are completely disassembled and glass beaded. The hood
is being prepped for gelcoat.
2/6/2006
The headlight assemblies are now restored. The hood is prepared on the
underside.
2/13/2006
The new front is being brought back into shape.
2/14/2006
The work continues to get the replacement front into shape.
2/15/2006
The frame is undergoing straightening then will receive a new front section.
2/16/2006
The areas where the frame is connected have inserts welding to the inside which
reinforce the attaching area.
The completed repair is undetectable.
While the frame repair which was ground was done using a MIG weld, the
visible areas are welded using ERA correct ARC welds. This retains the factory
appearance thus making the job further undetectable. The first image shows an
original weld that has been sandblasted and the repair weld after de-slagging.
2/17/2006
The frame is cosmetically prepped and is ready for painting.