Pricing guide:

Estimates-It is difficult to provide meaningful estimates for extensive restoration and service work. The initial to-do list for a project will inevitably expand as the work progresses. This can be the result of conditions that we uncover during the disassembly process and/or of an owner's evolving requests. No Two jobs are the same even on vehicles that may be similar in year and options. Consequently, the time and money required for the complete job would then need to be adjusted.

 Once a vehicle is inspected, an outline of work will be created based on your requests and our recommendations. This quote is by no means all inclusive or closed end.

The most common requests are for the below categories and serve as a guide to outline basic procedures and the time associated with the specific task.

      Back to the Top


Body Refininishing
1953-1982
Labor Parts Time
Basic Refinishing includes the following items only:
wpe62.jpg (684 bytes) Remove all weather-stripping ------ ------
wpe62.jpg (684 bytes) Strip existing finish ------ ------
wpe62.jpg (684 bytes) Repair all seams ------ ------
wpe62.jpg (684 bytes) Seal fiberglass (Gel coat) ------ ------
wpe62.jpg (684 bytes) Apply epoxy primer ------ ------
wpe62.jpg (684 bytes) Apply polyurethane primer ------ ------
wpe62.jpg (684 bytes) Block sand ------ ------
wpe62.jpg (684 bytes) Refinish in base coat (color approved by owner) ------ ------
wpe62.jpg (684 bytes) Clear coat ------ ------
wpe62.jpg (684 bytes) Sand and polish clear coat (if requested) ------ ------
wpe62.jpg (684 bytes) Detail exterior ------ ------
Subtotal   200-500 hrs
          
wpe62.jpg (684 bytes) Clean and paint engine compartment, with engine out ------ 6 hrs.
     includes removal of wiring and components   1 hr
wpe62.jpg (684 bytes) Replace door weather-strips   2.5 hr
wpe62.jpg (684 bytes) Replace hood weather-strip   1 hr
wpe62.jpg (684 bytes) Replace hatch weather-strip   1 hr
wpe62.jpg (684 bytes) Replace trunk weather-strip   1.2 hrs
wpe62.jpg (684 bytes) Disassemble body trim components ------ 20 hrs
wpe62.jpg (684 bytes) Reassemble body trim components ------ direct time
wpe62.jpg (684 bytes) Straighten and polish stainless steel trim ------ direct time
wpe62.jpg (684 bytes) Panel replacement ------ ------
wpe62.jpg (684 bytes) Re-chrome bumpers (cores must be good)   5 hr
wpe62.jpg (684 bytes) Replace 63-67 coupe top door weather-strips   4 hrs
wpe62.jpg (684 bytes) Replace vent window weather-strips and channel   5.0

     Back to the Top


Engine Removal/Re-Installation
Labor Parts Time
wpe62.jpg (684 bytes) Clean body, cover upper surround in two layers bubble wrap   ------
wpe62.jpg (684 bytes) Remove hood, drain coolant from engine block and radiator, drain engine and transmission oil, remove radiator and support ------ ------
wpe62.jpg (684 bytes) Disconnect wiring to engine components ------ ------
wpe62.jpg (684 bytes) Remove alternator, AIR pump and all pulleys ------ ------
wpe62.jpg (684 bytes) Remove carburetor(s) ------ ------
wpe62.jpg (684 bytes) Remove distributor and shielding ------ ------
wpe62.jpg (684 bytes) Drain and disconnect fuel system ------ ------
wpe62.jpg (684 bytes) Remove shifter and linkage ------ ------
wpe62.jpg (684 bytes) Disconnect clutch linkage ------ ------
wpe62.jpg (684 bytes) Set up and adjust engine lifting equipment ------ ------
wpe62.jpg (684 bytes) Remove engine ------ ------
wpe62.jpg (684 bytes) Air Conditioning equipped - Evacuate system, remove A/C compressor and hoses ------ 1-3 hr
wpe62.jpg (684 bytes) Bubble wrap and inventory all components removed ------ ------
Subtotal 8-15 hrs
      
wpe62.jpg (684 bytes) Install engine in car ------ 3 hrs
wpe62.jpg (684 bytes) Install components (includes refinishing) ------ 8 hrs
wpe62.jpg (684 bytes) Test start car and proceed with break-in ------ 2 hrs
wpe62.jpg (684 bytes) Air conditioned cars add additional labor and parts, refrigerant
Refrigerant- market cost
---- 6 -12hrs
    
All engine re-installations require the following parts:
Radiator hoses (OEM style)   ------
Heater hoses (OEM style)   ------
Water pump   ------
Fuel pump   ------
Belts   ------
12 qt. engine oil   ------
2 oil filters for break-in period 1 replacement   ------
Subtotal   ------
 
 

       Back to the Top


Engine Remanufacture
Small Block

Labor Parts Time
wpe62.jpg (684 bytes) Disassemble engine completely ------ ------
wpe62.jpg (684 bytes) Bake engine block and components ------ ------
wpe62.jpg (684 bytes) Bore and hone engine block ------ ------
wpe62.jpg (684 bytes) Cut and polish crankshaft ------ ------
wpe62.jpg (684 bytes) Recondition connecting rods ------ ------
wpe62.jpg (684 bytes) Check line bore ------ ------
wpe62.jpg (684 bytes) Press piston pins ------ ------
wpe62.jpg (684 bytes) Install valve guides ------ ------
wpe62.jpg (684 bytes) Balance reciprocating assembly ------ ------
      total time 22-30hrs
wpe62.jpg (684 bytes) Level 4 engine kit ------ ------
wpe62.jpg (684 bytes) 8 cast pistons ------ ------
wpe62.jpg (684 bytes) 1 set piston rings ------ ------
wpe62.jpg (684 bytes) 1 set main bearings ------ ------
wpe62.jpg (684 bytes) 1 set rod bearings ------ ------
wpe62.jpg (684 bytes) 1 set camshaft bearings ------ ------
wpe62.jpg (684 bytes) Galley plug set ------ ------
wpe62.jpg (684 bytes) Camshaft ------ ------
wpe62.jpg (684 bytes) 16 valve lifters ------ ------
wpe62.jpg (684 bytes) 16 push rods ------ ------
wpe62.jpg (684 bytes) 16 rocker arms ------ ------
wpe62.jpg (684 bytes) 16 valves ------ ------
wpe62.jpg (684 bytes) 16 valve springs ------ ------
wpe62.jpg (684 bytes) 16 retainers ------ ------
wpe62.jpg (684 bytes) 16 keeper units ------ ------
wpe62.jpg (684 bytes) Oil pump and screen ------ ------
wpe62.jpg (684 bytes) 3 piece timing set ------ ------
wpe62.jpg (684 bytes) Complete gasket kit ------ ------
           total parts ------
wpe62.jpg (684 bytes) Clean block - hand wash with soap and water, air dry ------ ------
wpe62.jpg (684 bytes) Prime bare block ------ ------
wpe62.jpg (684 bytes) 3 angle valve job ------ ------
wpe62.jpg (684 bytes) Assemble cylinder heads ------ ------
wpe62.jpg (684 bytes) Check all engine clearances ------ ------
wpe62.jpg (684 bytes) Assemble engine ------ ------
wpe62.jpg (684 bytes) Degree camshaft ------ ------
wpe62.jpg (684 bytes) Refinish complete engine ------ ------
    32hrs

54-75 hrs

       Back to the Top


Engine Remanufacture
Big Block
Labor Parts Time
wpe62.jpg (684 bytes) Disassemble engine completely ------ ------
wpe62.jpg (684 bytes) Bake engine block and components ------ ------
wpe62.jpg (684 bytes) Bore and hone engine block ------ ------
wpe62.jpg (684 bytes) Cut and polish crankshaft ------ ------
wpe62.jpg (684 bytes) Recondition connecting rods ------ ------
wpe62.jpg (684 bytes) Check line bore ------ ------
wpe62.jpg (684 bytes) Press piston pins ------ ------
wpe62.jpg (684 bytes) Install valve guides ------ ------
wpe62.jpg (684 bytes) Balance reciprocating assembly ------ -----
      total 22-30hrs
wpe62.jpg (684 bytes) Level 4 engine kit ------ ------
wpe62.jpg (684 bytes) 8 cast pistons ------ ------
wpe62.jpg (684 bytes) 1 set piston rings ------ ------
wpe62.jpg (684 bytes) 1 set main bearings ------ ------
wpe62.jpg (684 bytes) 1 set rod bearings ------ ------
wpe62.jpg (684 bytes) 1 set camshaft bearings ------ ------
wpe62.jpg (684 bytes) Galley plug set ------ ------
wpe62.jpg (684 bytes) Camshaft ------ ------
wpe62.jpg (684 bytes) 16 valve lifters ------ ------
wpe62.jpg (684 bytes) 16 push rods ------ ------
wpe62.jpg (684 bytes) 16 rocker arms ------ ------
wpe62.jpg (684 bytes) 16 valves ------ ------
wpe62.jpg (684 bytes) 16 valve springs ------ ------
wpe62.jpg (684 bytes) 16 retainers ------ ------
wpe62.jpg (684 bytes) 16 keeper units ------ ------
wpe62.jpg (684 bytes) Oil pump and screen ------ ------
wpe62.jpg (684 bytes) 3 piece timing set ------ ------
wpe62.jpg (684 bytes) Complete gasket kit ------ ------
           total ------
wpe62.jpg (684 bytes) Clean block - hand wash with soap and water, air dry ------ ------
wpe62.jpg (684 bytes) Prime bare block ------ ------
wpe62.jpg (684 bytes) 3 angle valve job ------ ------
wpe62.jpg (684 bytes) Assemble cylinder heads ------ ------
wpe62.jpg (684 bytes) Check all engine clearances ------ ------
wpe62.jpg (684 bytes) Assemble engine ------ ------
wpe62.jpg (684 bytes) Degree camshaft ------ ------
wpe62.jpg (684 bytes) Refinish complete engine ------ -----
    32-hr

54-75 hrs

      Back to the Top


We accept Visa and MasterCard!