|
Engine
Removal/Re-Installation |
| Labor |
Parts |
Time |
 |
Clean body, cover upper surround
in two layers bubble wrap |
|
------ |
 |
Remove hood, drain coolant from
engine block and radiator, drain engine and transmission oil, remove radiator and support |
------ |
------ |
 |
Disconnect wiring to engine
components |
------ |
------ |
 |
Remove alternator, AIR pump and
all pulleys |
------ |
------ |
 |
Remove carburetor(s) |
------ |
------ |
 |
Remove distributor and shielding |
------ |
------ |
 |
Drain and disconnect fuel system |
------ |
------ |
 |
Remove shifter and linkage |
------ |
------ |
 |
Disconnect clutch linkage |
------ |
------ |
 |
Set up and adjust engine lifting
equipment |
------ |
------ |
 |
Remove engine |
------ |
------ |
 |
Air Conditioning equipped -
Evacuate system, remove A/C compressor and hoses |
------ |
1-3 hr |
 |
Bubble wrap and inventory all
components removed |
------ |
------ |
|
Subtotal |
|
8-15 hrs |
|
|
|
|
 |
Install engine in car |
------ |
3 hrs |
 |
Install components (includes
refinishing) |
------ |
8 hrs |
 |
Test start car and proceed with
break-in |
------ |
2 hrs |
 |
Air conditioned cars add
additional labor and parts, refrigerant
Refrigerant- market cost |
---- |
6 -12hrs |
|
|
|
|
| All engine
re-installations require the following parts: |
|
Radiator hoses (OEM style) |
|
------ |
|
Heater hoses (OEM style) |
|
------ |
|
Water pump |
|
------ |
|
Fuel pump |
|
------ |
|
Belts |
|
------ |
|
12 qt. engine oil |
|
------ |
|
2 oil filters for break-in period
1 replacement |
|
------ |
|
Subtotal |
|
------ |
|
|
|
|
| |
| |